Skip to main content

A.C.M - Cabildo

2200 hectares of Gold and Copper. Studies and drilling underway.  Site has 3 entrances from main road easy access, with proper roads and production facilities.

KUB 1-3 Copiapo

6000 hectares of IOCG. Studies and ariel surveys  underway.  Site has various shafts with copper seams. Easy access, with proper roads and close to some of world largest operating mines.

Contact us
 

Tunnels

Developing Tunnels and connecting them. 

 

Gold ore

Strong Gold presence. 

 

IOCG project

We have acquired 6600 hectares of potential IOCG project with past Iron and Copper history.

 

Core Drilling